Tuesday, 20 September 2016

CONCRETE FLOOR SLAB - SECOND POUR

                     

 The majority of the house footprint.  He slab is reinforced with steel mesh.   Pipework protrusions are made with sleeves to accommodate the necessary services.Beneath the polythene is a layer of compacted sand on top of a porous hard fill.   Using the same construction as the first floor slab. T

No comments:

Post a Comment