Thursday, 17 November 2016

Inspecting Single-Point Adjustable Scaffolds


  • The rigging has been designed by a qualified person.
  • The scaffold is positioned so swinging cannot bring it into contact with other surfaces.
  • The scaffold is accessible to rescuers.
  • The support rope is protected from rubbing during direction changes.
  • Make sure, when combining two single-point scaffolds to form a two-point suspension system
  • Make sure the supporting rope between the scaffold.
  • Check that the maximum intended load for single-point adjustable suspension scaffolds is 250 pounds.
  • The suspension device is kept vertical, unless:

No comments:

Post a Comment