Tuesday, 6 December 2016

Mobile Scaffold Tower Erection Procedure Instructions


  • Fit castors into the base frames.
  • Attach horizontal brace to vertical tube of base frame.
  • Attach spare end of brace to the other base frame. 
  • Attach a plan brace diagonally in a horizontal plane into the base frames.
  • Insert Working Platforms.
  • The top working deck must be 3 transoms from the top of the scaffold.


No comments:

Post a Comment