- Ever overload a scaffold with materials.
- Always check for overhead power lines before moving any scaffolds.
- Overhead dangers should be identified and controlled.
- If the height of the scaffolds exceed 15 metres for frame scaffold.
- Overhead power lines should be de-energized.
- All towers should be plumbed and levelled.
No comments:
Post a Comment